Place of Origin: | Jiangsu.China |
---|---|
Brand Name: | Dagyee |
Certification: | ISO9001 |
Model Number: | DAF-020 |
Minimum Order Quantity: | 1PCS |
Price: | Negotiable |
Packaging Details: | Wooden box, standard container, Customers can specify requirements |
Delivery Time: | 15-30 work days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 20SET |
Brand Name: | Dagyee | Material: | Steel Bracket, Q235B 304 316 |
---|---|---|---|
Flow Rate: | 2m3/h | Footprint: | 3.4*2.4 |
Color: | As Requested | Desalination Rate: | 99% |
Warranty: | 1 Year | Type: | Automatic |
Highlight: | 1.5kw DAF unit wastewater,DAF unit wastewater,2m3/h DAF system water treatment |
DAF-020 Edi SS304 Carbon Steel High Hydraulic Load With Skimmer Waste Water Treatment Dissolved Air Flotation
Oil Water Separator Wastewater Plant Treatment DAF Dissolved Air Flotation is an efficient flotation method for water clarification. The term refers to the method of producing flotation by dissolving air in the water under pressure and then releasing the pressure. When the pressure is released the solution becomes supersaturated with air as millions of small bubbles form. These bubbles attach to any particles in the water causing their density to become less than that of water. The particles then rapidly float to the surface for collection and removal, leaving the clarified water behind.
Dissolved Air Flotation Equipment Specifications
Parameter |
Units |
DAF 002 |
DAF Flow Rate |
m3/hr |
2 |
Total Inlet Solids |
mg/L |
500-6500 |
FOG Removal |
% |
80~97 (Application Dependent) |
TSS Removal |
% |
60~99 (Application Dependent) |
COD Removal |
% |
20~80 (Application Dependent) |
BOD Removal |
% |
20~80 (Application Dependent) |
Power Consumption |
kW |
1.5 |
Footprint |
m |
3.4*2.4 |
Inlet |
in |
2 |
outlet |
in |
2 |
Sludge outlet |
in |
4 |
Vent |
in |
4 |
STANDARD INCLUSIONS + OPTIONS ✓= Standard Supply, o = Optional Supply |
||
Skimmer Mounted Plant |
✓ |
|
Feed Pump |
✓ |
|
Micro bubble generator |
✓ |
|
Recycle clean water system |
✓ |
|
Maintenance platform, ladder |
✓ |
|
Pre-Treatment |
o |
|
Control System |
✓ |
|
Control System with PLC |
o |
|
Air Compressor |
✓ |
|
Treated Water Recycling for Saturator |
o |
|
Coagulation, flocculation reaction device |
o |
|
Chemical powder dissolving dosing device |
o |
Main Process Characteristics
Total suspended solids (TSS) reduction up to 97%
Chemical oxygen demand (COD) removal up to 85%
Low-cost operation and maintenance
Standard and customized units meet a variety of application and flow ranges
Designed for ease of installation and use
Suitable for high-salinity water
FAQ Of Dissolved Air Flotation
1. How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
4. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5. How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.